Turnkey cost is the number owners want when they want one accountable path to handover. It is larger than grey structure because the product includes defined finishing — not because a contractor “added margin” in the abstract. See the turnkey service page for the scope boundary.

This page is about cost drivers. For inclusions, read what is included in turnkey construction. The Grey vs Semi vs Turnkey matrix sits beside both so we do not invent a second inclusion list.

Open the Cost Calculator with turnkey selected. Finish level (standard, premium, luxury) moves fittings and joinery. Luxury bands also widen the planning range because fixture selection is less settled. Plot size still matters: pair this with the 5 Marla, 10 Marla or 1 Kanal articles rather than copying a neighbour’s sqft rate.

What turnkey still excludes unless stated: land, society/authority charges, furniture, appliances, landscaping, basement. Those sit outside the online range — see estimator methodology.

Turnkey projects show delivery, not a frozen cost. Islamabad process is on the city hub. When you are ready, request a consultation with a specification intent (even a room-by-room finish note) so the BOQ can name brands and allowances instead of assuming them.