Material Estimator

Indicative steel, cement, brick, sand and crush quantities for grey, semi and turnkey homes — separate from our PKR/sqft Cost Estimator.

Indicative planning quantities only — not a structural bill of quantities or quotation. Final quantities require drawings, a soil report and site engineering. Markets and rates change; Tryino Homes accepts no liability for procurement based solely on this tool.

Material Estimator
Indicative · Not a BoQ
10 M

Looking for PKR/sqft cost ranges? Use the Cost Estimator.

5,000 sqft 5–8 monthsGrey Structure

On-screen summary

Free indicative quantities. Full branded PDF is gated after a quick lead form.

Steel
21,000 kg
Cement
1,100 bags
Bricks
47,500 nos
Sand
4,250 cft
Crush
3,500 cft
Concrete
2,750 cft
Concrete by element
foundation
770 cft
columns
495 cft
beams
440 cft
slab
1,045 cft
MaterialsPKR 81.0 Lakh95.1 Lakh
LabourPKR 44.6 Lakh52.3 Lakh
MEP / finish bandPKR 11.9 Lakh14.5 Lakh
Contingency (~10%)~PKR 15.0 Lakh
Indicative totalPKR 1.51 Cr1.78 Cr
  • Not a structural BoQ — for planning conversations only
  • PDF report includes the same tables with Tryino branding
Get Free Estimate