Planning a 5-marla grey structure? Use this preset to see indicative material quantities before you ask for a BoQ. Adjust storeys or covered area, then download a branded material report.
Indicative planning estimate only — not a Bill of Quantities, quotation, structural design, or procurement schedule. Actual quantities and costs depend on architectural and structural drawings, soil conditions, specifications, site access, supplier rates, workmanship and market changes. Confirm final quantities through approved drawings and a project-specific BOQ before procurement.
Indicative planning estimate only — not a Bill of Quantities, quotation, structural design, or procurement schedule. Actual quantities and costs depend on architectural and structural drawings, soil conditions, specifications, site access, supplier rates, workmanship and market changes. Confirm final quantities through approved drawings and a project-specific BOQ before procurement.
Covered area has the greatest effect on the estimate. Enter the total from your architectural drawings (all floors including basement).
Looking for PKR/sqft cost ranges? Use the Cost Estimator.
Estimated rate: PKR 3,480 / covered sqft
Planning range: PKR 7.60 million – 8.80 million
Scope: Grey Structure · Duration: 6–8 months
Timeline depends on drawings, approvals, labour availability, procurement, weather and design complexity.
For planning context on reinforcement quantities, read how much steel is needed for a house.
No. These are planning quantities only. Final steel and concrete need drawings and soil data.
Yes by default. Switch to single storey in the calculator if your plan is ground floor only.