Tools

5 Marla Grey Structure Materials

Planning a 5-marla grey structure? Use this preset to see indicative material quantities before you ask for a BoQ. Adjust storeys or covered area, then download a branded material report.

Indicative planning quantities only — not a structural bill of quantities or quotation. Final quantities require drawings, a soil report and site engineering. Markets and rates change; Tryino Homes accepts no liability for procurement based solely on this tool.

Material Estimator
Indicative · Not a BoQ
5 M

Looking for PKR/sqft cost ranges? Use the Cost Estimator.

2,500 sqft 5–8 monthsGrey Structure

On-screen summary

Free indicative quantities. Full branded PDF is gated after a quick lead form.

Steel
10,500 kg
Cement
550 bags
Bricks
23,750 nos
Sand
2,125 cft
Crush
1,750 cft
Concrete
1,375 cft
Concrete by element
foundation
385 cft
columns
248 cft
beams
220 cft
slab
523 cft
MaterialsPKR 40.5 Lakh47.6 Lakh
LabourPKR 22.3 Lakh26.2 Lakh
MEP / finish bandPKR 5.9 Lakh7.3 Lakh
Contingency (~10%)~PKR 7.5 Lakh
Indicative totalPKR 75.5 Lakh89.2 Lakh
  • Not a structural BoQ — for planning conversations only
  • PDF report includes the same tables with Tryino branding

FAQ

Is this a structural BoQ?

No. These are planning quantities only. Final steel and concrete need drawings and soil data.

Does 5 marla assume double storey?

Yes by default. Switch to single storey in the calculator if your plan is ground floor only.

Get Free Estimate