One kanal equals twenty marla. This preset loads a double-storey grey structure so overseas and future owners can size steel and cement orders before engaging a full design package.
Indicative planning estimate only — not a Bill of Quantities, quotation, structural design, or procurement schedule. Actual quantities and costs depend on architectural and structural drawings, soil conditions, specifications, site access, supplier rates, workmanship and market changes. Confirm final quantities through approved drawings and a project-specific BOQ before procurement.
Indicative planning estimate only — not a Bill of Quantities, quotation, structural design, or procurement schedule. Actual quantities and costs depend on architectural and structural drawings, soil conditions, specifications, site access, supplier rates, workmanship and market changes. Confirm final quantities through approved drawings and a project-specific BOQ before procurement.
Covered area has the greatest effect on the estimate. Enter the total from your architectural drawings (all floors including basement).
Looking for PKR/sqft cost ranges? Use the Cost Estimator.
Estimated rate: PKR 3,480 / covered sqft
Planning range: PKR 2.48 crore – 2.87 crore
Scope: Grey Structure · Duration: 6–8 months
Timeline depends on drawings, approvals, labour availability, procurement, weather and design complexity.
For planning context on reinforcement quantities, read how much steel is needed for a house.
In local practice 1 kanal = 20 marla. The calculator also accepts kanal input directly.
Yes — select RCC Basement Walls and enter basement covered area from drawings to split total covered area into superstructure and basement zones. Basement raises steel and concrete while reducing brick masonry. Partial or parking basements need a plot review.