Turnkey adds a finishing allowance on top of the same grey-structure materials. Use this preset when you want a move-in-ready planning view for a 10-marla home.
Indicative planning estimate only — not a Bill of Quantities, quotation, structural design, or procurement schedule. Actual quantities and costs depend on architectural and structural drawings, soil conditions, specifications, site access, supplier rates, workmanship and market changes. Confirm final quantities through approved drawings and a project-specific BOQ before procurement.
Indicative planning estimate only — not a Bill of Quantities, quotation, structural design, or procurement schedule. Actual quantities and costs depend on architectural and structural drawings, soil conditions, specifications, site access, supplier rates, workmanship and market changes. Confirm final quantities through approved drawings and a project-specific BOQ before procurement.
Covered area has the greatest effect on the estimate. Enter the total from your architectural drawings (all floors including basement).
Looking for PKR/sqft cost ranges? Use the Cost Estimator.
Estimated rate: PKR 5,424 / covered sqft
Planning range: PKR 2.06 crore – 2.39 crore
Scope: Turnkey · Standard · Duration: 11–14 months
Timeline depends on drawings, approvals, labour availability, procurement, weather and design complexity.
For planning context on reinforcement quantities, read how much steel is needed for a house.
Yes for structural steel, cement, bricks, sand and crush. Turnkey adds finishing cost and a longer timeline — it does not invent extra structural quantities.
Yes — use the home Cost Estimator for PKR/sqft ranges, and this tool for quantity and cost breakdowns.