Seven-marla plots are a common family size in Bahria Enclave and Park View. This page preloads grey-structure defaults so you can plan procurement bands and timelines.
Indicative planning estimate only — not a Bill of Quantities, quotation, structural design, or procurement schedule. Actual quantities and costs depend on architectural and structural drawings, soil conditions, specifications, site access, supplier rates, workmanship and market changes. Confirm final quantities through approved drawings and a project-specific BOQ before procurement.
Indicative planning estimate only — not a Bill of Quantities, quotation, structural design, or procurement schedule. Actual quantities and costs depend on architectural and structural drawings, soil conditions, specifications, site access, supplier rates, workmanship and market changes. Confirm final quantities through approved drawings and a project-specific BOQ before procurement.
Covered area has the greatest effect on the estimate. Enter the total from your architectural drawings (all floors including basement).
Looking for PKR/sqft cost ranges? Use the Cost Estimator.
Estimated rate: PKR 3,480 / covered sqft
Planning range: PKR 9.75 million – 1.13 crore
Scope: Grey Structure · Duration: 6–8 months
Timeline depends on drawings, approvals, labour availability, procurement, weather and design complexity.
For planning context on reinforcement quantities, read how much steel is needed for a house.
Yes — change construction scope in the calculator. Structural material quantities stay the same; finishing allowance is added on top.
They are indicative for standard solid brick walls. Blockwork and elevations change totals.