Construction scope

Grey Structure

Structural shell and basic MEP rough-ins.

What is grey structure construction?

Grey structure is the structural shell of a house: site preparation, foundations, the reinforced-concrete frame, columns and beams, roof slabs, masonry, plaster and basic plumbing and electrical rough-ins, without interior finishes, flooring, paint, kitchens or fixtures. Tryino delivers that scope against a written Bill of Quantities, with engineering supervision at each stage and weekly photo reports, across Islamabad and Rawalpindi including Bahria Enclave, Park View City, DHA and B-17. Finishing materials, sanitary fittings and electrical fixtures stay out of the price unless the BOQ explicitly says otherwise — a common source of confusion when comparing quotations at the same PKR/sqft rate. Grey structure typically costs less than turnkey because it stops at the shell rather than continuing through finishing. Use the calculator for a grey-structure planning range across 5 Marla to 1 Kanal plots, then confirm exact inclusions in a signed BOQ before construction starts.

Grey structure planning ranges

These PKR bands come from the same live estimator configuration as the Cost Calculator (double-storey, Islamabad, premium grey). They are planning figures, not a quotation — soil, drawings and BOQ still change the number.

5 Marla
PKR 69.8 LakhPKR 78.7 Lakh

Typical window 4–6 months

10 Marla
PKR 1.40 CrorePKR 1.57 Crore

Typical window 5–7 months

Typically included

  • Foundations and RCC frame
  • Masonry / blockwork
  • Roof / floor slabs
  • Basic plaster
  • MEP rough-ins
  • Roof waterproofing basics (where included in the grey package)

Typically excluded

  • Flooring, paint and interior finishes
  • Kitchens, wardrobes and sanitary fixtures
  • Electrical fixtures and most MEP finishes
  • Furniture, appliances and landscaping
  • Land cost and authority / society charges unless separately stated

Exact inclusions are defined in the project BOQ and specification schedule.

Grey vs turnkey at a glance

This table matches the comparison resource. It is a planning view — your signed BOQ is the contract.

ItemThis scope
Foundation & structural frameIncluded
Masonry / blockworkIncluded
Roof / floor slabsIncluded
Basic plasterIncluded
Electrical & plumbing rough-insIncluded
FlooringNot included
Paint & ceilingsNot included
Kitchen & wardrobesNot included
Sanitary fixturesNot included
Electrical fixturesNot included
Doors & windows (finish package)Not included
Ready-to-move handover (agreed finish)Not included

Also see Turnkey Construction or the full comparison guide. Islamabad homeowners: grey structure construction in Islamabad.

Ready to price this scope on your plot? Open the calculator, then request a consultation for a BOQ-based review.

Estimate Grey Structure
FAQs

Grey Structure FAQs

Clear answers on scope, cost planning, process and coverage.

A grey structure BOQ typically lists foundation and RCC quantities, masonry and blockwork, slab specifications, basic plaster coverage, and electrical/plumbing rough-in points, with finishing items explicitly excluded. Tryino Homes issues this as a written bill of quantities before construction starts, so both sides agree on scope before mobilisation. See the sample BOQ for a reference structure.