
1.5 Kanal Semi Furnished House in Bahria Enclave Islamabad
30 Marla · Residential · 7,800 sq ft · Semi-Finished · 2026
Semi-finished · Islamabad
Semi-finished house construction in Islamabad means grey structure plus selected finishing categories. Semi-finished can mean different things between contractors — Tryino defines the exact included and excluded work in the project BOQ and specification schedule.
At Tryino Homes, semi-finished construction means grey structure plus selected finishing work. Semi-finished can mean different things between contractors — Tryino defines the exact included and excluded work in the project BOQ and specification schedule.
Typically included: Everything in the verified grey structure package; Selected finishing categories defined in the BOQ; Core MEP progression as specified for the package. Typically excluded: Items not listed in the semi-finished BOQ / specification; Furniture, appliances and soft furnishings; Some premium fixtures unless separately agreed; Land cost and authority / society charges unless separately stated. Exact inclusions are defined in the project BOQ and specification schedule.
The structural shell — foundations, RCC frame, masonry, slabs, basic plaster and MEP rough-ins — is in. Flooring, paint, kitchen, sanitary fixtures, electrical fixtures and doors/windows sit in the BOQ as selected items, not as an implied package. Ready-to-move handover is not part of semi-finished; that is turnkey.
Choose semi-finished when you want more completed work than a grey shell without locking a full turnkey specification. Compare the three scopes, then run the calculator with semi-finished selected. A written quote still needs drawings and a site review.
Side-by-side inclusions — flooring and fixtures on semi stay “defined in BOQ”.
Learn moreStop at the shell if you will finish later or stage cashflow.
Learn moreStructure through defined finishing under one team.
Learn moreCDA approvals and society requirements to check before the first pour.
Learn morePreliminary PKR range with semi-finished selected.
Learn moreHire-intent page for grey, semi-finished and turnkey.
Learn morePlot, storeys and which finishing categories sit in the semi-finished BOQ.
Architectural and structural sets for the applicable authority.
Grey quantities plus selected finishing lines — not assumed brands.
Shell and MEP rough-ins under the same contract.
Only the categories written into the specification schedule.
Snag against the signed semi-finished package — not a turnkey move-in.
Grey structure plus selected intermediate finishing.
Selected finishing is listed. If a category is not in the BOQ, it is not in the price.
Finishing items outside the agreed schedule stay with the owner.
Semi-finished calculator band before a written quote.
Planning bands only (excluding land). Selected finishing categories move the midpoint. Confirm with the live calculator, then a written BOQ.
Building with a basement? Add it to your estimate.
| Plot size | Typical scope | Planning note |
|---|---|---|
| 5 Marla | Semi-finished | Open calculator |
| 7 Marla | Semi-finished | Open calculator |
| 10 Marla | Semi-finished | Open calculator |
| 1 Kanal | Semi-finished | Open calculator |

30 Marla · Residential · 7,800 sq ft · Semi-Finished · 2026
Related: Grey vs semi vs turnkey · Grey structure construction Islamabad · Turnkey house construction Islamabad · Construction company Islamabad · Cost calculator
Clear answers on scope, cost planning, process and coverage.
At Tryino Homes, semi-finished construction means grey structure plus selected finishing work. Semi-finished can mean different things between contractors — Tryino defines the exact included and excluded work in the project BOQ and specification schedule.
Typically included: Everything in the verified grey structure package; Selected finishing categories defined in the BOQ; Core MEP progression as specified for the package. Typically excluded: Items not listed in the semi-finished BOQ / specification; Furniture, appliances and soft furnishings; Some premium fixtures unless separately agreed; Land cost and authority / society charges unless separately stated. Exact inclusions are defined in the project BOQ and specification schedule.
Share your plot size, location and construction type. A Tryino engineer replies during business hours.
Step 1 of 5: What are you planning?
20%